CPS uses LEAN Design and LEAN Construction principles building into the plan into the design opportunities for parallel efforts among Trades to create work flow momentum.
Weather is one of three key risks which impact every construction plan. CPS specializes in written planning with special risk mitigating control measures such as methods to monitor and hold temperatures to ensure the best and quickest concrete cure times during cold weather pours.
Vendor Surveillance in-process internal tray installation inspections for diesel distillation column. Vessel was cut in half after hydro test to facilitate travel via truck at (2) pcs 95ft long.